Interior / Exterior Warehouse & Distribution Center  

  

Need warehouses markings for multiple properties across multiple states? Our # Specialized National Division and our certified partners for West Coast has got you covered. We specialize in Warehouses management and maintenance across the country.

 

 

 

If you are looking to work with a dependable warehouse striping to complete your project, we have the experience to get your job done right.

As with most painting, a major portion of the job involves preparation, removing old striping and getting the floor surface ready for restriping. In ideal conditions, our work methods and procedures allow us to complete up to 5,000 to 10,000 linear feet of layout and application per day.

Often, these tasks need to be scheduled around normal warehouse operations, adding complexity to the task. If this is the case with your project, we are able to complete your warehouse floor striping project after hours and in phases so the affect on your normal operations is minimal.

 

warehouse striping line markings warehouse floor striping

 

 Texas – Services Include:

  • New Layout
  • Removal of old warehouse striping
  • Modifying your current warehouse striping layout
  • Repainting faded warehouse striping
  • OSHA compliant floor markings
  • Safety aisle warehouse striping
  • Aisle markings
  • Line removal
  • Warehouse striping consultation
  • Product staging area
  •  Aisle Marking and Stenciling
  • http://universalstriping.com/get-a-quote/

Shot Blasting Service

Shot blasting is the first step of our warehouse pavement striping process. The shot blaster fires steel abrasive materials powered by compressed air onto the surface to be striped. This has the effect of the removing all surface materials, including contaminants (organic and inorganic), paints and any other materials. The blaster then uses a special magnet to continuously gather the shot back into its hopper and a vacuum to gather particulates, meaning that it leaves no mess whatsoever and no dangerous dusts. We carefully use the shot blaster on a 6 inch section to ensure that the surface is truly clear of all debris. Appropriately preparing the surface means that paint will adhere and last longer over time.

 

From start to finish, our warehouse striping jobs usually take between two and three days. This time varies based on the size of the facility’s operations and other special requirements as set forth by the client. Right now, we work with facilities small and large, that include both local, one-off warehouses and facilities for entire nationally-recognized brands.

 

Markings may include but not limited to:

  • Safety and Directional Arrows
  • Fork Lift Lanes and Emergency Evacuation Routes
  • Hashed Areas
  • Caution Zones
  • Walking Lanes
  • Staging lanes
  • Storage lanes
  • Numbering
  • Dock bays
  • Hatch areas
  • Pedestrian walkways
  • Fire exits
  • Walking men stencils
  • Forklift parking for battery charging
  • Product Stalls or Pick lanes and more.

 

We have worked with many fortune 500 companies such as Coca Cola, FedEx, Amazon, Home Depot, Target, J.B Hunt, XPO Logistics, Werner Enterprices, American Airlines, JetBlue Airline, Costco and more.                                                              



Contact Our Office Today 

 (800) 491-9064


We Are Serve: Houston, San Antonio, Dallas, Austin, Fort Worth, El Paso, Arlington, Corpus,  Christ, iPlano, Laredo, Lubbock, Garland, Irving, Amarillo, Grand Prairie, Brownsville, McKinney, Pasadena, Frisco, Mesquite, Killeen, McAllen, Waco, Carrollton…And Their Surrounding Cities!

http://www.universalseal.net

author avatar
Universal Seal